Third request to replace missing pictures sent 7/13/12 As promised, this is of interest to those who have converted to chain drive or have other chain drive bikes.
The first photo shows the snoodleflapper JB welded and wired onto the oil tube where it contacts the chain just aft of the front sprocket.
The second photo shows the two aluminum blocks. One is milled to fit the slot in the sprocket cover, the other is milled to hold immobile, the oil tube in position.
The third shows the oil resevoir and the metering valve.
hose clamped to the battery box through slots dremeled into the box.
The last photo shows the top threaded cap removed to allow filling the resevoir.
NOTE- remove battery before cutting slots.
Bike Fixer