Donate!
Welcome, Guest. Please Login or Register :: View Members
Pages: 1 ... 69 70 71 
Send Topic Print
1987 Savage Street Tracker build (Read 8099 times)
TheSneeze
Serious Thumper
*****
Offline



Posts: 1280
Northern Nevada
Gender: male
Re: 1987 Savage Street Tracker build
Reply #1050 - 01/09/25 at 12:34:01
 
When it's cloudless, we have very blue skies.  When the shop is done, my sky will be even bluer, and the birds will be chirping, the planets will all line up (actually happening this month!), and nothing will be able to wipe the smile off my face!!  Cool

The tape and mud is going on the drywall, finally.  We have heaters running in the shop.  Hopefully texture and paint will be on sometime next week.
Back to top
 
 

Every twenty minute job is a stripped thread away from being a three day ordeal.

'87 LS650h Savage Street Tracker (destroyed by fire)
'86 LS650g Savage (parts bike)
'81 Kawasaki KZ750e ELR tribut
  IP Logged
TheSneeze
Serious Thumper
*****
Offline



Posts: 1280
Northern Nevada
Gender: male
Re: 1987 Savage Street Tracker build
Reply #1051 - 01/11/25 at 21:29:33
 
Taping the drywall is done.  Mudding the rest of the drywall screws will continue on Monday.  We are heating the shop to cure the mud without it freezing. The overnight temps have been in the upper teens to the lower twenties. The heaters keep it around the mid sixties overnight.  Texture should go on late next week, followed by prime and paint. Once painted, the finish electrical will go in, then the floor coating.  Wood burning stove install, and we are done!
Back to top
 
 

Every twenty minute job is a stripped thread away from being a three day ordeal.

'87 LS650h Savage Street Tracker (destroyed by fire)
'86 LS650g Savage (parts bike)
'81 Kawasaki KZ750e ELR tribut
  IP Logged
Pages: 1 ... 69 70 71 
Send Topic Print


« Home

 
« Home
SuzukiSavage.com
01/14/25 at 05:37:18



General CategoryRubber Side Down! › 1987 Savage Street Tracker build


SuzukiSavage.com » Powered by YaBB 2.2!
YaBB © 2000-2007. All Rights Reserved.